Light Pole Installation Method Statement

Material used will be as approved by the engineer the sizes and routes routing will be as per the approved shop drawing.
Light pole installation method statement. The contractor shall only use equipment rated for such weight. E16 22 street light poles and arms e16 22 1 the contractor shall handle store and transport the poles and arms in a manner to prevent damage. Anchor bolts are specifically manufactured for pole foundations and each pole requires anchor bolts of an exact diameter and length. Installation methods of external exterior and outdoor lighting system includes lighting equipment luminaires control gears panel boards poles brackets cabling and allied minor civil works.
5 once the pole is lowered into place resting on the dumpy levelling nuts maintain the strain on the pole and using one of the spanners adjust the dumpy. Deliver components parts to site completely identified in accordance with shop and certified drawings prepared for this work. A particular set up is shown in figure 1. This information cannot be comprehensive enough to cover all situations or the details of all structures.
Dismantle existing pole lantern and feeder pillar. Base for 25 35 pole is 680 kg. Set up to be symmetrical about the pole axis to. If installation required heavy vehicles extreme care has to be taken for preventing damages of.
Power and lighting system for the whole building. All installations are to be carried out under strict supervision of qualified supervisors and engineers. Firstly we contact with the departments of the pipeline to understand the approximate distribution of underground cables and knowing the detailed division of underground pipelines through excavation channels. This method statement will define the following works.
Ensure all finishing works in all related areas are completed for the area of installation and released cleared by civil section to proceed on with the installation of lighting fixtures. Pole assembly installation for street light poles figure 1. Led street light pole installation procedure there are 6 in stallation procedures of led street lamp pole for your reference. Installation guidelines 091015 1 installation guidelines for sports high mast lighting structures the following information is intended as a guide for the installing contractor.
This guide covers the installation of light poles. This method statement is to define the method to be used to ensure that the street light fittings are dismantled and installed correctly and acceptable and shall conform to the contract documents and specification. By manual method prior to lowering the pole have one of the installation crew rotate the pole to match the position of the bolts and gently lower the pole maintaining alignment.